This activity is used to define work list required to handle resources and materials needed with in an execution item template. A description along with a long description and a duration (number of hours planned for the work list) can be entered for each work list line. It considers defining every alternative work list required by the execution item template. It is also possible to define configuration rules on each work list line. These rules are evaluated when different configurations for a Released compatible unit template is performed.
This can be performed in Compatible Unit Template Navigator page Work Lists tab.
As a result of this activity, work lists will be added for the execution item template.