Modify Node Basic Data

Explanation

This activity is used to modify basic data of a node such as the node description, currency code and the floating period.

Prerequisites

In order to perform this activity, the status of the consolidation structure should be In Progress.

System Effects

As a result of this activity, basic data of the nodes are modified and updated to the consolidation structure.