This activity is used to disconnect a node with reporting entity connections from the node above it, and then connect it to another node via a single structure operation. The node will be moved together with connected reporting entities and sub nodes.
In order to perform this activity, the status of the consolidation structure should be In Progress.
As a result of this activity: