This activity is used to define urgency levels used in several processes, such as work-related problems. When entering data, start with the most urgent level, as the system automatically assigns urgency level rank starting with 1 (the most urgent).
If you want to change urgency level, you can use the Move Up and Move Down buttons by selecting the relevant urgency level.
There are no prerequisites.
As a result of this activity, urgency levels will be defined in the system.