This activity is used to copy steps from one cost allocation procedure to another. Copying steps is facilitated since steps in a procedure are usually similar for each period.
In order to perform this activity:
As a result of this activity, the selected step/steps are copied to the procedure. The activity may also result in factors and distributions connected to the original step being copied from the source procedure to the destination procedure. If you copy steps from a procedure with Actual allocation type to a procedure with Budget allocation type or vice versa, the step type of the relevant steps will be automatically changed as follows.
Allocation Type of the Original Procedure | Allocation Type of the Destination Procedure | Steps Replaced |
Actual | Budget |
|
Budget | Actual |
|