To set a date-effective daily line rate for the production line, click Takt Time, then Set Line Rate. This rate represents the planned maximum or optimum production rate total, for the parts to be produced per day. This figure is used in production schedule loading routines as a capacity figure. The line rate is also used as a display, to compare the preferred line rate to the current schedule loads, current demands, etc.
In the Set Production Line Run Rate dialog, you can compare the current run rates and phase-in dates with the average daily demand:
You can remove, modify existing run rates, and enter new run rates on the Line Rates tab.
A daily line rate will be valid from the defined date for the production line.