Analyze Cost Bucket in Cost Set One

Explanation

Use the page to study cost buckets connected to cost set one. You cannot change anything in this page. When executing the job Copy Costs to Cost Set One, system saves all cost buckets that are connected to the Part Cost's template into this page. The cost bucket information in this page is used by for example shop order costing. If there are some problems with postings in shop order costing, then it can be good to check whether a specific Cost Bucket is missing or has wrong setup.

Prerequisites

Costs should have been copied to cost set one.

System Effects

N/A