When executing the job Copy Costs to Cost Set One, system saves the source
cost set information both in Part Cost (cost set 1), and Part Costs History.
By having this information in Part Costs History, users can follow up how costs
have been developed over time in Cost Set 1.
Use Part Costs History page
to follow up how costs have been developed of time for part or parts. You cannot
change anything in this page.
Drill down to the Part Cost History Detail
page to check all the details for the specific part cost history record. Part
Cost History Detail is very similar to the Part Cost page. Here you can analyze
detailed information about the product structure and cost buckets. For example
you can study level costs of a component part deep down in the product structure.Use
this function to analyze Part Cost History graphically.
Costs should have been copied to cost set one.
No systems effects.