Calculate Cost for Single Part, All Levels

Explanation

Use this activity to calculate costs for a single part at all levels. Note: You cannot perform a cost calculation for cost set 1. This optional task is to be performed by a system administrator or equivalent person.

Calculating part costs on all the levels means that costs for parts at underlying structures are considered as well as the costs for the selected part. When calculating the costs, the costs set up throughout the system are gathered and attributed to the correct part.

You can enter a specific version (alternative) for a part structure and routing. You can also define parts so that the calculation is stopped and costs are not rolled up. Component part costs will be updated only if the Struct.Alt. and the Rout.Alt fields are set to the default value; indicated by an asterisk(*)

This activity can be performed in the All Levels Part Cost Calculation, Part Cost and Part Costs page.

If by-products exist, you can distribute the costs between by-products and the primary product. When calculating the product cost, if you use by-product cost distribution, the sum of the specified percentage of each by-product for this item is calculated. The remaining percentage will be calculated from the primary product.

If material overheads are defined in part overheads, material overheads are added to to the parent level in the cost structure. When material and general overheads are connected to a part, and the part cost record has a template which consists of a cost bucket that is connected to a cost element which uses cost element source 501 or 502, during cost calculations for a site or part or cost set, the system fetches cost using different overhead units as follows:

Prerequisites

This activity has the following prerequisites:

System Effects