Enter Pre-Posting, MRO Shop Order
Explanation
This activity is used to enter pre-postings to a MRO shop order.
Prerequisites
- Specify whether pre-posting is allowed. This can be done in
IFS/Accounting Rules,
Posting
Control by adding
the posting type M105, Pre-Accounting Shop Order.
- The MRO shop order must have been created.
System Effects
As a result of this activity,
- The system establishes a relationship between the code part and the
MRO shop order, by entering a pre-posting connected to the MRO shop
order.
- The code part value that you enter as a pre-posting for the MRO shop
order will affect several postings created for this MRO shop order. The
postings that will be affected by the pre-posting are generally all
postings concerning expenses, revenue and work in process (WIP).