Add Standard Operation to Estimate

Explanation

To copy standard operations to the Operations tab of an estimate item, click Add Standard Operation. It is only possible to copy the standard operation information for estimate, not referred as for routings. Copy is the only option since reference would provide the possibility to influence the estimate cost calculation by updating the standard operation parameters. Changes of the operation parameters which have an impact on the cost calculation is only allowed from the estimate operation record itself.

Prerequisites

This activity requires that:

System Effects

This action copies a standard operation to the list of operations for the selected item.