Roll Back Proposal

Explanation

This activity is used to rollback a depreciation proposal with Posted status. It is possible to use the option Run in Backgrond to perform the rollback as a background job.

Prerequisites

Before the status can be reversed, the following must have been completed:

System Effects

As a result of this activity the proposal gets the Rollbacked status.