Connect or Modify Control Measures

Explanation

This activity is used to link predefined control measures to the hazard, that is identified during the risk assessment.

User can add these details under the Hazard Details option and use it specify the control measure and the description of the control measure and time frames

Prerequisites

There are no prerequisites.

System Effects

There are no system effects.