This activity is used to manage the status and revision handling of a linear asset.
The following actions are used to change the operational status:
If IFS/Asset Design is installed and a design object is connected to the linear asset, the following actions are used to change the design status and hence the revision of a linear asset:
Refer to About Linear Asset for a complete description of statuses.
Changing the operational status may cause the status of connected segments to change, if chosen to do so. It is also possible to change status on individual segments and that may cause the operational status on the linear asset to change.
Changing the design status to ReDesign, a new revision of the linear asset will be created.