This system activity calculates safety stock, order point, and lot size for qualified parts.
Only possible if IFS/IPR is installed. This activity is automatically performated by the Demand plan server.
The process for the inventory planning and replenishment calculations must be defined in IFS/Demand Planner.
As a result of this activity, the system calculates safety stock, order point, and lot size as a background process for qualified parts.