Analyze Shop Order Multilevel Material Availability

Explanation

Use this activity to analyze the availability of all levels (including the parent part) for a single shop order.

Configure below simulation options to control the calculation, then click Simulate Material Availability to trigger the calculation:

Once the calculation completed, the list will show the availability of each part in the structure. The Availability Message field helps in determining whether or not to create new supplies for the given part. The messages and the respective indications are as follows:

Select Show Shortages Only to display only the component lines for which there is a material shortage, i.e. components for which the projected quantity on hand on the required date is less than zero.

You can also analyze the supply/demand details for a part by expanding the line using the caret down icon.

Prerequisites

System Effects

N/A