Cancel Clocking
Explanation
This activity is used to cancel a labor, machine, interruption, indirect
labor or machine downtime clocking record.
- To cancel a labor, machine or interruption clocking from the Shop Floor Workbench
page, expand the operation and open the Clockings
tab. Click Cancel Clocking and then either Cancel,
Cancel Stop, Cancel Team Start or
Cancel Team Stop.
- To cancel an indirect labor clocking from the Shop Floor
Workbench page, click Manage Indirect Time and then
Clockings. In
the Indirect Clockings dialog, click Cancel Clocking
and then click either Cancel,
Cancel Stop, Cancel Team Start or Cancel Team Stop.
- To cancel a machine downtime clocking from the Shop Floor
Workbench page, click Manage Downtime and then
Clockings. In
the Downtime Clockings dialog, click Cancel Clocking
and then click either Cancel or
Cancel Stop.
- To cancel a clocking from the Shop Floor Clockings
page, click Cancel Clocking and then either Cancel,
Cancel Stop, Cancel Team Start or
Cancel Team Stop.
- To cancel a clocking from the Time Card or
Time Card - Details pages, select the relevant
clocking interval in the calendar area and click the Delete
icon,
Cancel Stop, Cancel Team Start or
Cancel Team Stop.
Prerequisites
- A clocking record must exist.
- For machine and interruption clockings, the Cancel Stop
option is only available for the latest clocking for each operation.
- For labor clockings, the Cancel Stop option is only available
for the latest clocking for each operation and employee assumed the
clocking does not have a team stamp.
- For indirect labor clockings, the Cancel Stop option is only
available for the latest clocking for each employee assumed it does not
have a team stamp.
- For stopped labor and indirect clockings, the Cancel Start
option is only available for clockings without a team stamp.
- The Cancel Team Start option is only available for active
labor and indirect clockings with a team stamp.
- The Cancel Team Stop option is only available for the latest
clocking for each operation with a team stamp for each employee.
System Effects
- The cancel action will remove all clocking records within the
sequence and reverse possible operation/indirect labor history/machine
downtime history transaction.
- The cancel stop action will remove the stop time on all clocking
records within the sequence and reverse possible operation/indirect
labor history/machine downtime history transaction. The activity will be
running again.
- The cancel team start action will remove all clocking sequences on
the operation or indirect job for all employees currently in that team.
- The cancel team stop action will remove the stop time on all
clocking sequences on the operation or indirect job for all employees
currently in that team.