Follow-up Production Schedule
Explanation
This activity is used to review the history logs of actions that have been
performed for a given production schedule. Material history logs for following
actions will be registered automatically when one of following material actions
is performed:
- Issue material
- Un-issue material
- Receive manufactured product
- Receive by-product
- Receive substitute part
- Un-receive manufactured product
- Un-receive by-product
- Un-receive substitute part
- Scrap product WIP (Work in Progress)
- Un-scrap product WIP
Prerequisites
- Production Schedule must have been
received/scrapped (Report point or Complete) or reversed, to review the
relevant material history logs.
System Effects
None