Report Labor Time

Explanation

Use this activity to report labor time for a shop order operation. It can be the time needed to set up an operation before manufacturing begins (setup time) or the time of the actual manufacturing (runtime). Crew size indicates the number of people that worked on the operation. A crew size less than 1 indicates a person worked partly on the operation during its duration.

To report labor for a shop order operation from:

Prerequisites

System Effects