Define Master Schedule Level 0 Part
Explanation
Use this activity to register a part as master scheduling level 0 part.
Prerequisites
- An inventory part with planning method O must exist.
- Product family master data for the part must have been entered.
System Effects
As a result of this activity, the part is registered as a master schedule
level 0 part.