Remove Entire Master Schedule - MS Level 0

Explanation

This activity is used to remove master schedules from a selected MS set for the entire site. This works as a complete bulk delete of master schedules for a certain level 0 MS set in a given site.

Prerequisites

This activity requires you to select only one master schedule set at a time.

System Effects

As a result of this activity, all master schedules connected to the selected MS set will be removed permanently from the MS level 0 part of the selected site.