Use this activity to connect or modify work guidelines to a selected structure component. Work guidelines can be created manually or from a work guideline template.
If a work guideline template is to be used, that template must be defined. A structure component must also be defined for a part.
As a result of this activity, the system connects work guidelines to a structure component.
Configuration Structure
Configuration Structure Component
Product Structure
Product Structure Component
Recipe Structure
Recipe Structure Component
Structure Component Work Guidelines
Structure Components Work Guidelines
Complete Recipe Structure
Complete Configuration Structure
Complete Product Structure