Use this activity to set a connection between a parent part and one of its components.
As a result of this activity the parent part will inherit the lot/batch number from the component with Lot/Batch Origin selected. Reserve and issue could only be done from one lot only (for the selected component).
Note: When selecting the Lot/Batch Origin the Expiration Date Origin will automatically be selected.
Note: This value will be inherited to the order, where it will be editable.