Use this activity to enter criteria required for condition-based generation of PM actions, i.e., test points and parameters. In this case, you control maintenance actions based on the condition of the equipment, which is in turn determined by measurements of certain previously specified parameters (variables). In order to perform condition-based generation, you should define those parameters first. There are two types of parameters: cumulative and limit values.If it is a cumulativeparameter, enter a start value and interval. It creates a maintenance line inthe Maintenance Plan tab. If the parameter is a limit value, enterminimum and maximum values. When the condition limits exceed, a workorder is generated based on the PM action. Limit values are minimum and maximum values for when the PM action is to occur.
Note: When accumulated condition-basedĀ PM action is set to Performed Value Based = Yes, user has the option of choosing which method to use to get the Value at Maintenance, in order to generate the condition-based maintenance forecast. This can be done using the Condition Forecast Configuration in the PM action/General tab. The DEFAULT value will be set as Last Measurement at Maintenance. Refer the following online help document: PM Plan
Before the criteria is entered, the following must have been completed: