Perform MRP Site Report

Explanation

This activity is used to order a printout of the MRP( Material Requirements Planning) results. The report contains the system-generated proposals from the planning methods. If you do not want to enter a specific selection criterion for the site, planner, part number, part type commodity group 1, commodity group 2, product family, product code and low level code leave the fields blank. All output from these fields will be displayed.

Prerequisites

The material requirements calculation must have been performed. 

System Effects

As a result of this activity, the system creates an MRP report.