Save Standard Cost for Configured Parts

Explanation

This activity is used to save the standard cost for configured parts within a DOP or interim order structure.

Prerequisites

A DOP or interim demand header with a structure for a configured part must exist.

System Effects

As a result of this activity, the calculated cost for the configured parts in the structure is saved as the standard cost for the specific configuration ID.