This activity is used to display a cost performance graph of a DOP structure.
The cost performance graph can be viewed on the DOP Cost and Performance Monitoring page.
Before this function can be performed, all the DOP costs need to be calculated.
Note: To get the most correct graph, the actual cost should be calculated every work day for the DOP structure. This can be done by starting a scheduled job that calculates the actual cost every day for a specific DOP structure or a specific site.
As a result of this activity, a cost performance graph is displayed.