Explanation

Use this page to view the low level code assigned for different parts within the Planning Network. Once the MRP is performed for selected Planning Network it calculates low level code for parts within the Planning Network, This will be calculated each time when MRP performed for the selected Planning Network and the results will be updated in this page. The low level code assigned for parts after performing site MRP / PMRP will not be overridden when performing MRP for the Planning Network.