This activity is used to remove an execution logic structure template that has been incorrectly defined.
To perform this activity, a grouping ID in either the New, Under Preparation or Obsolete status must exist.
As a result of this activity, the grouping ID and all connected grouping criteria and performed sequencing will be removed.