10.6.3.1 Report Operations
10.6.3.2 Report Operations from Shop Floor Workbench
10.6.3.3 Report Operations from Time Clock
10.6.3.4 Report Outside Operations
10.6.3.5 Report Outside Operations from Shop Floor Workbench
10.8.1.1 Receive Disassembled Overhaul Object
10.6.8.1 Maintain Shop Order
About Disassembly Shop Orders
10.6.2.1 Issue Shop Order Material
10.6.2.2 Issue Shop Order Components from Shop Floor Workbench
10.6.2.3 Issue Shop Order Components using Pick List
10.8.2.1 Automatic Disassembly
7.9.6.1 Handle Shop Order
7.9.6.2 Handle Shop Order Batch and Serial Tracking
7.9.6.3 Handle Shop Order Configuration
7.9.6.4 Handle Shop Order Control Plan
7.9.6.5 Handle Shop Order Material and Operations
7.9.6.6 Handle Shop Order Reports
7.9.6.7 Handle Shop Order Split and Merge
7.9.12.1 Reserve Shop Order Material
7.9.12.2 Handle and Reserve Multi Level Repair Structure
About Disassembly Shop Orders
Shop Order
Receive MRO Shop Order
MRO Material Availability
MRO Interim Order
MRO Interim Order Structure
Manufacturing Material History
Shop Order Costs
Shop Orders Costs
About Position Parts
Disposition Shop Order
Shop Order
Shop Order Costs
Manufacturing Material History
13.11.4.1 Report Production Quality
13.11.4.2 Report Production Quality from Shop Floor Workbench
Off Logs and On Logs