Copy Control Plan

Explanation

Once a control plan manufacturing, control plan purchasing or control plan inventory is in the Active status, you cannot change it. If the control plan requires changes, you can make a copy of the control plan rather than creating a new one with the same data.

To copy a control plan, click Copy Control Plan, eventually update information in the Copy Control Plan dialog and click OK.

Prerequisites

There must be an existing control plan.

System Effects

As a result of this activity, a new control plan is created with status Created, which is a copy of an existing control plan.