Define Control Plan Lines

Explanation

Each control plan manufacturing, control plan purchasing or control plan inventory consists of two levels: a header and one or more lines. This activity is used to create new control plan lines. A control plan line for manufacturing specifies how a part is going to be controlled or tested when doing a particular routing operation belonging to the routing entered in the control plan header. A control plan line for purchasing specifies how a purchased part is going to be controlled or tested when purchased from the supplier entered in the control plan header. A control plan line for inventory specifies how a part is going to be controlled or tested when performing analysis in inventory.

For each control plan line, the sample size has to be calculated when an analysis is created. To calculate the sample size, an inspection code has to be defined. The inspection type specifies whether the sample size is based on a fixed quantity or a sample percentage of the order size. It is not possible to use Percentage as the inspection type if the part is used as a production schedule part. 

For acceptance sampling, a system-generated inspection code is used, which has a sample percentage of 100%. The actual sample size will be calculated by the system when analysis is created. A control plan line using the inspection code for acceptance sampling will be automatically connected to an acceptance sampling trigger.

To create a new control plan line click the new command on the Control Plan Lines tab and enter information about the template line. To make it mandatory to attach a media item to the result, enable Media Required. In the Data Type field select Attributes, Variables or Categorical. If the data type is set to Categorical, enter a category ID or use the List of Values (LOV) picker to choose from the available category IDs in the Category field. If the data type is set to Variable, enter information about the tolerance limits in the Outer Min, Inner Min, Nominal Value, Inner Max and Outer Max fields. The nominal value is required, together with either the combination Inner Min/Inner Max or Outer Min/Outer Max. Finally click Save.

Prerequisites

System Effects

As a result of this activity, one or more control plan lines are created. The inspection code selected in the control plan line, will control the sample size for each data point when the analyses are created.