Perform Due Calculation for Modification Events

Explanation

This activity is used to calculate the due date of the modification or inspection that is to be performed on an assigned serial. The due calculation is performed for each serial based on the average operational value per month, the effective date and the execution intervals (i.e., Initial Inspections, Continued Inspections and Terminating Action) which are defined on the modification.

To perform this activity select the Calculate Modification option from the Modification Details page or the Define Modification page. The calculated due dates can be viewed in the Assign Serials tab of the Modification Details page. If IFS/Complex MRO is used, select the Perform Due Calculation option from the Manage Work Scope Events page to calculate due dates for all the events which are to be performed during a shop visit.