Release Sub Contract
Explanation
This activity is used to release a sub contract.
Prerequisites
- A sub contract with lines and items must exist.
- The sub contract must be in the Planned status.
- An active sub contract revision must exist.
System Effects
- The sub contract is set to the Released status.