10.6.3.1 Report Operations 10.6.3.2 Report Operations from Shop Floor Workbench 10.6.3.3 Report Operations from Time Clock 10.6.3.4 Report Outside Operations 10.6.3.5 Report Outside Operations from Shop Floor Workbench 10.8.1.1 Receive Disassembled Overhaul Object 10.6.8.1 Maintain Shop Order About Disassembly Shop Orders 10.6.2.1 Issue Shop Order Material 10.6.2.2 Issue Shop Order Components from Shop Floor Workbench 10.6.2.3 Issue Shop Order Components using Pick List 10.8.2.1 Automatic Disassembly 7.9.6.1 Handle Shop Order 7.9.6.2 Handle Shop Order Batch and Serial Tracking 7.9.6.3 Handle Shop Order Configuration 7.9.6.4 Handle Shop Order Control Plan 7.9.6.5 Handle Shop Order Material and Operations 7.9.6.6 Handle Shop Order Reports 7.9.6.7 Handle Shop Order Split and Merge 7.9.12.1 Reserve Shop Order Material 7.9.12.2 Handle and Reserve Multi Level Repair Structure About Disassembly Shop Orders Shop Order Receive MRO Shop Order MRO Material Availability MRO Interim Order MRO Interim Order Structure Manufacturing Material History Shop Order Costs Shop Orders Costs About Position Parts Disposition Shop Order Shop Order Shop Order Costs Manufacturing Material History 13.11.4.1 Report Production Quality 13.11.4.2 Report Production Quality from Shop Floor Workbench Off Logs and On Logs
MRODisassembly