Reset Value After Repair
Explanation
This activity is used to manually reset the Value After Repair
to zero for a serial at the conclusion of a maintenance visit. If required,
the value can be reset for all serials in its structure by enabling the Reset
all serials in the structure option from theĀ
Reset Value After Repair dialog.
Note : Entered date in the Reset Date feild will be set as the last
measure date for the operational logging generated when the Value After Repair
is reset. For maintenance events in the Finished status, the finish date
of the maintenance event will be set by default, but you may adjust this date.
The date cannot be earlier than the date of the last operational logging for
the serial.
Prerequisites
- To reset the value for a serial, the connected maintenance event must
be in the Started, Work Done or Finished status.
- The reset cannot be done for an overhaul or cycle event since completion
of this event already resets the values for value after overhaul and value
after repair.
System Effects
- The Value After Repair will be reset to zero for all operational
parameters for the serial connected to the maintenance event. If selected,
the value will be reset for all serials in its structure as well.
- A new operational logging will be generated when the Value After Repair
is reset.
- A text will be added to the Measure Remark field on the generated
operational logging, indicating that the logging was created because of
a reset and not because of an actual logging.