Assign Cost Buckets to Cost Template

Explanation

Use this activity to assign the cost buckets of your choice to a new cost template.

Note 1: If you want to capture material overhead cost for sub-assemblies, you should enter a Material Overhead cost bucket for which the cost element source ID is 500 (Total Cost). Enable the Manufaturing Cost option. Ignore the warning message. The material overhead cost will show up as level cost at the parent level.

Note 2: If you want to capture material overhead for purchased parts which use the weighted average inventory valuation method or where the inventory part cost level is set to Cost Per Serial, you should enter a material overhead cost bucket for which the cost element source ID is 500 (Total Cost). The material overhead cost will show up as level cost at the parent level.

 

Prerequisites

System Effects

This activity will assign the cost buckets of your choice to the selected cost template.