After entering posting cost groups you can connect them to cost buckets. This activity is used to connect posting cost groups to existing cost buckets in the system.
If your cost bucket is already connected to another posting cost group, you can modify the connection through this activity. If you need to modify the posting cost group for several cost buckets, it is recommended that you change all of them at once. This is because modifying the posting cost group will result in generation of a lot of revaluation transactions through a background job.
Note: If your cost buckets haven't been entered as yet, you should use activity Define Cost Bucket to enter cost buckets and simultaneously connect them to posting cost groups.
New posting cost groups will be connected to cost buckets. Revaluation transactions will be initiated for all parts in stock or transit with the Cost Bucket ID in its cost detail structure. Even if several buckets connected to a part are modified, only a single revaluation transaction is created per part record. All inventory value queries and reports will display new values.
Modifying the posting cost group will change postings already created on inventory transactions. Financially, the values will be moved from the old posting cost group to the new one.
Trans Code / Posting Event | Description | Direction | Debit Posting | Credit Posting |
PCGCHG- | Posting Cost Group change Remove value for old Posting Cost Group | 0 | M183 | M1 |
PCGCHG+ | Posting Cost Group Change Insert value for new Posting Cost Group | 0 | M1 | M183 |
Trans Code / Posting Event | Description | Direction | Debit Posting | Credit Posting |
PCGCHGTR- | Posting Cost Group Change Remove value in transit for old Posting Cost Group | 0 | M183 | M3 |
PCGCHGTR+ | Posting Cost Group Change Insert value in transit for new Posting Cost Group | 0 | M3 | M183 |
Trans Code / Posting Event | Description | Direction | Debit Posting | Credit Posting |
CO-PCGCHG- | Posting Cost Group Change Remove value for old Posting Cost Group Supplier Consignment | 0 | M183 | M60 |
CO-PCGCHG+ | Posting Cost Group Change Insert value for new Posting Cost Group Supplier Consignment | 0 | M60 | M183 |