Main analysis scenarios are:
To see which dimension tables that can be used with each fact table in, for example Excel pivot analysis, see section Relationships below.
Model Table | DW Source view (SQL Server) | BI Access View | Referenced Information Source | Recommended Access Type |
PROJECT TRANSACTIONS | FACT_PROJECT_TRANS_TM | FACT_PROJECT_TRANS_BI | FACT_PROJECT_TRANSACTIONS | On Line |
PROJECT FORECAST ITEM PERIOD PFP | FACT_PROJ_FRC_ITEM_PER_TM | FACT_PROJ_FRC_ITEM_PER_BI | FACT_PROJ_FRC_ITEM_PER | On Line |
INVOICING PLANS | FACT_INVOICING_PLANS_TM | FACT_INVOICING_PLANS_BI | FACT_INVOICING_PLANS | On Line |
PROJECT ACTIVITY PERFORMANCE ANALYSIS | FACT_ACTIVITY_CALCULATION_TM | FACT_ACTIVITY_CALCULATION_BI | FACT_ACTIVITY_CALCULATION | On Line |
PROJECT HISTORY DETAILS PHD | FACT_PROJECT_HISTORY_LOG_TM | FACT_PROJECT_HISTORY_LOG_BI | FACT_PROJECT_HISTORY_LOG | On Line |
PROJECT FORECAST ITEM PFI | FACT_PROJ_FORECAST_ITEM_TM | FACT_PROJ_FORECAST_ITEM_BI | FACT_PROJ_FORECAST_ITEM | On Line |
PROJECT FORECAST SNAPSHOT PFS | FACT_PROJ_FRC_SNAP_SUM_TM | FACT_PROJ_FRC_SNAP_SUM_BI | FACT_PROJ_FRC_SNAP_SUM | On Line |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD | FACT_PROJ_FRC_SNAPSHOT_TM | FACT_PROJ_FRC_SNAPSHOT_BI | FACT_PROJ_FRC_SNAPSHOT | On Line |
PROJECT ACTIVITY INFORMATION | FACT_PROJ_ACTIVITY_INFO_TM | FACT_PROJ_ACTIVITY_INFO_BI | FACT_PROJ_ACTIVITY_INFO | On Line |
REPORTING CURRENCY RATE | FACT_CURRENCY_RATES_TM | FACT_CURRENCY_RATES_BI | FACT_CURRENCY_RATES | On Line |
Corresponding Information Sources are described below. Detailed infomation about Information Sources can be found in IFS Cloud Documentation.
FACT_PROJECT_TRANS
Purpose of the Project Transaction information source is to retrieve information from the project reporting related transactions to enable reporting and analysis using IFS/Business Reporter.
FACT_PROJ_FRC_ITEM_PER
The purpose of the Project Forecast Item Period information source is to facilitate reporting and analysis capabilities from IFS/ Project Budgeting and Forecasting on a forecast item period level. The information source may be used for instance when creating reports in IFS Business Reporter. All the amounts can be shown in base, transaction, budget and project currency.
FACT_INVOICING_PLANS
Purpose of the Invoicing plan information source is to retrieve information from the project invoicing plan to enable reporting and analysis using IFS/Business Reporter.
FACT_ACTIVITY_CALCULATION
The Project Activity Performance Analysis information source is developed to facilitate the in-depth project performance analysis.The measure items selected in the Fact table are a numerous indicators which are calculated on the activity level. Note some of these indicators are interdependent and calculated based on each other. Examples on indicators are ACWP, BCWP (EV), BCWS CV, SV, CPI, SPI, VAC, IEAC, IETC, calculated progress both on hours and cost.
FACT_PROJECT_HISTORY_LOG
The Project History Details information source, is aimed at providing historical project data to be used for reporting and analysis purposes for instance in IFS Business Reporter. The historical data can be fetched according to the connection details level. See also the general description on information source Project Connection Details. History data is created either through history logging or when a baseline is created.
FACT_PROJ_FORECAST_ITEM
The purpose of the Project Forecast Item information source is to retrieve information from IFS/Project Budgeting and Forecasting on an item level for reporting and analysis purposes. All the amounts can be shown in base, transaction, budget and project currency. The reporting may be done based on the Work Breakdown Structures (WBS) or on cost elements and Cost Breakdown Structures (CBS).
FACT_PROJ_FRC_SNAP_SUM
The purpose of the Project Forecast Snapshot information source is to retrieve information for creating reports and cubes, based on the project forecast detailed snapshot functionality in IFS/Project Budgeting and Forecasting. All the amounts can be shown in base, transaction, budget and project currency. The reporting may be done based on the Work Breakdown Structures (WBS) or on Cost Breakdown Structures (CBS). This information source can be used independent of the snapshot type but the amounts cannot be divided into different object types.
FACT_PROJ_FRC_SNAPSHOT
The purpose of the Project Forecast Snapshot information source is to retrieve information for creating reports and cubes, based on the project forecast snapshot functionality in IFS/Project Budgeting and Forecasting. All the amounts can be shown in base, transaction, budget and project currency. The reporting may be done based on the Work Breakdown Structures (WBS) or on Cost Breakdown Structures (CBS). This information source can only be used for snapshot taken with details. The amounts can be divided into different object types.
FACT_PROJ_ACTIVITY_INFO
The Project Activity information source facilitates reporting and analysis capabilities on progress, cost, hours and revenue figures on activity level. On Cost and Hours information about estimated, planned, baseline, planned committed, committed, used and actual values in addition to earned value and scheduled work may be retrieved. On Revenue estimated, planned, preliminary, posted and actual values may be analyzed.
FACT_CURRENCY_RATES
Currency Rate information source is based on IFS\Accounting Rules\Currency. This information source can be used to design reports using Currency Rate information..
Model Table | DW Source view (SQL Server) | BI Access View | Referenced Information Source | Recommended Access Type |
ACCOUNT | DIM_ACCOUNT_TM | DIM_ACCOUNT_BI | DIM_ACCOUNT | On Line |
ACCOUNTING PERIOD | DIM_ACCOUNTING_PERIOD_TM | DIM_ACCOUNTING_PERIOD_BI | DIM_ACCOUNTING_PERIOD | On Line |
ACTIVITY | DIM_ACTIVITY_TM | DIM_ACTIVITY_BI | DIM_ACTIVITY | On Line |
ACTUAL FINISH DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
ACTUAL START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
BASELINE FINISH DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
BASELINE START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
CODE B | DIM_CODE_B_TM | DIM_CODE_B_BI | DIM_CODE_B | On Line |
CODE C | DIM_CODE_C_TM | DIM_CODE_C_BI | DIM_CODE_C | On Line |
CODE D | DIM_CODE_D_TM | DIM_CODE_D_BI | DIM_CODE_D | On Line |
CODE E | DIM_CODE_E_TM | DIM_CODE_E_BI | DIM_CODE_E | On Line |
CODE F | DIM_CODE_F_TM | DIM_CODE_F_BI | DIM_CODE_F | On Line |
CODE G | DIM_CODE_G_TM | DIM_CODE_G_BI | DIM_CODE_G | On Line |
CODE H | DIM_CODE_H_TM | DIM_CODE_H_BI | DIM_CODE_H | On Line |
CODE I | DIM_CODE_I_TM | DIM_CODE_I_BI | DIM_CODE_I | On Line |
CODE J | DIM_CODE_J_TM | DIM_CODE_J_BI | DIM_CODE_J | On Line |
COMPANY | DIM_COMPANY_TM | DIM_COMPANY_BI | DIM_COMPANY | On Line |
CURRENCY | DIM_CURRENCY_CODE_TM | DIM_CURRENCY_CODE_BI | DIM_CURRENCY_CODE | On Line |
CUSTOMER | DIM_CUSTOMER_TM | DIM_CUSTOMER_BI | DIM_CUSTOMER | On Line |
CUT OFF DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
EARLY FINISH DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
EARLY START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
EMPLOYEE CATEGORY | DIM_EMPLOYEE_CATEGORY_TM | DIM_EMPLOYEE_CATEGORY_BI | DIM_EMPLOYEE_CATEGORY | On Line |
EMPLOYEE | DIM_EMPLOYEE_TM | DIM_EMPLOYEE_BI | DIM_EMPLOYEE | On Line |
FORECAST EARLY FINISH DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
HISTORY DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
LATE FINISH DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
LATE START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
ORGANIZATION CODE | DIM_ORGANIZATION_CODE_TM | DIM_ORGANIZATION_CODE_BI | DIM_ORGANIZATION_CODE | On Line |
PLANNED INV DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
POSITION | DIM_POSITION_TM | DIM_POSITION_BI | DIM_POSITION | On Line |
PRICE ADJUSTMENT | DIM_PRICE_ADJUSTMENT_TM | DIM_PRICE_ADJUSTMENT_BI | DIM_PRICE_ADJUSTMENT | On Line |
PRJREP START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
PROJ BILLING CATEGORY | DIM_PROJ_BILLING_CATEGORY_TM | DIM_PROJ_BILLING_CATEGORY_BI | DIM_PROJ_BILLING_CATEGORY | On Line |
PROJ END DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
PROJ FCST CONN CCO | DIM_PROJ_FCST_CONN_CCO_TM | DIM_PROJ_FCST_CONN_CCO_BI | DIM_PROJ_FCST_CONN_CCO | On Line |
PROJ FCST CONN RFC | DIM_PROJ_FCST_CONN_RFC_TM | DIM_PROJ_FCST_CONN_RFC_BI | DIM_PROJ_FCST_CONN_RFC | On Line |
PROJ FORECAST TYPE | DIM_PROJ_FORECAST_TYPE_TM | DIM_PROJ_FORECAST_TYPE_BI | DIM_PROJ_FORECAST_TYPE | On Line |
PROJ FORECAST | DIM_PROJ_FORECAST_TM | DIM_PROJ_FORECAST_BI | DIM_PROJ_FORECAST | On Line |
PROJ START DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
PROJECT COST REVENUE ELEMENT | DIM_COST_REV_ELEMENT_TM | DIM_COST_REV_ELEMENT_BI | DIM_COST_REV_ELEMENT | On Line |
PROJECT PROGRAM | DIM_PROJECT_PROGRAM_TM | DIM_PROJECT_PROGRAM_BI | DIM_PROJECT_PROGRAM | On Line |
PROJECT | DIM_PROJECT_TM | DIM_PROJECT_BI | DIM_PROJECT | On Line |
REPORT CODE | DIM_REPORT_CODE_TM | DIM_REPORT_CODE_BI | DIM_REPORT_CODE | On Line |
REPORTING CURRENCY | DIM_REPORTING_CURRENCY_TM | DIM_REPORTING_CURRENCY_BI | DIM_REPORTING_CURRENCY | On Line |
REPORTING DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
REPORTING PERIOD | DIM_REPORTING_PERIOD_PROJECT_TM | DIM_RPD_COMPANY_PERIOD_BI | DIM_RPD_COMPANY_PERIOD | On Line |
SUB PROJECT | DIM_SUB_PROJECT_TM | DIM_SUB_PROJECT_BI | DIM_SUB_PROJECT | On Line |
WORK LOCATION | DIM_WORK_LOCATION_TM | DIM_WORK_LOCATION_TM | DIM_WORK_LOCATION | On Line |
ACCOUNT DATE | DIM_BI_TIME_TM | DIM_BI_TIME_BI | DIM_BI_TIME | On Line |
Refer technical documentation for more information.
Refer technical documentation for more information.
The following table lists the relationships between tables and columns in the model.
Relationship: Table (column) - Table (column) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_ACTIVITY_ID) - ACTIVITY (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_ACTUAL_FINISH_DATE_ID) - ACTUAL FINISH DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_ACTUAL_START_DATE_ID) - ACTUAL START DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_BASELINE_FINISH_DATE_ID) - BASELINE FINISH DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_BASELINE_START_DATE_ID) - BASELINE START DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_COMPANY_ID) - COMPANY (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_CUSTOMER_ID) - CUSTOMER (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_EARLY_START_DATE_ID) - EARLY START DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_FCAST_EARLY_FINISH_DATE_ID) - FORECAST EARLY FINISH DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_LATE_FINISH_DATE_ID) - LATE FINISH DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_LATE_START_DATE_ID) - LATE START DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_PROJ_PROGRAM_ID) - PROJECT PROGRAM (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_PROJECT_ID) - PROJECT (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_SUB_PROJECT_ID) - SUB PROJECT (ID) |
PROJECT HISTORY DETAILS PHD (DIM_ACTIVITY_ID) - ACTIVITY (ID) |
PROJECT HISTORY DETAILS PHD (DIM_ACTUAL_FINISH_DATE_ID) - ACTUAL FINISH DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_ACTUAL_START_DATE_ID) - ACTUAL START DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_COMPANY_ID) - COMPANY (ID) |
PROJECT HISTORY DETAILS PHD (DIM_COST_REV_ELEMENT_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT HISTORY DETAILS PHD (DIM_CURRENCY_CODE_ID) - CURRENCY (ID) |
PROJECT HISTORY DETAILS PHD (DIM_CUSTOMER_ID) - CUSTOMER (ID) |
PROJECT HISTORY DETAILS PHD (DIM_EARLY_FINISH_DATE_ID) - EARLY FINISH DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_EARLY_START_DATE_ID) - EARLY START DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_LATE_FINISH_DATE_ID) - LATE FINISH DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_LATE_START_DATE_ID) - LATE START DATE (ID) |
PROJECT HISTORY DETAILS PHD (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT HISTORY DETAILS PHD (DIM_PROJECT_ID) - PROJECT (ID) |
PROJECT HISTORY DETAILS PHD (DIM_SUB_PROJECT_ID) - SUB PROJECT (ID) |
PROJECT FORECAST ITEM PFI (Dim_Account_Id) - ACCOUNT (ID) |
PROJECT FORECAST ITEM PFI (Dim_Accounting_Period_Id) - ACCOUNTING PERIOD (ID) |
PROJECT FORECAST ITEM PFI (Dim_Activity_ID) - ACTIVITY (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_B_Id) - CODE B (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_C_Id) - CODE C (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_D_Id) - CODE D (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_E_Id) - CODE E (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_F_Id) - CODE F (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_G_Id) - CODE G (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_H_Id) - CODE H (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_I_Id) - CODE I (ID) |
PROJECT FORECAST ITEM PFI (Dim_Code_J_Id) - CODE J (ID) |
PROJECT FORECAST ITEM PFI (Dim_Company_ID) - COMPANY (ID) |
PROJECT FORECAST ITEM PFI (Dim_Cost_Rev_Element_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT FORECAST ITEM PFI (Dim_Currency_Code_ID) - CURRENCY (ID) |
PROJECT FORECAST ITEM PFI (Dim_Customer_ID) - CUSTOMER (ID) |
PROJECT FORECAST ITEM PFI (Dim_Cut_Off_Date_ID) - CUT OFF DATE (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_End_Date_ID) - PROJ END DATE (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Fcst_Conn_Cco_Id) - PROJ FCST CONN CCO (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Fcst_Conn_Rfc_Id) - PROJ FCST CONN RFC (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Forecast_Id) - PROJ FORECAST (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Forecast_Type_Id) - PROJ FORECAST TYPE (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT FORECAST ITEM PFI (Dim_Proj_Start_Date_ID) - PROJ START DATE (ID) |
PROJECT FORECAST ITEM PFI (Dim_Project_ID) - PROJECT (ID) |
PROJECT FORECAST ITEM PFI (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Accounting_Period_Id) - ACCOUNTING PERIOD (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Activity_ID) - ACTIVITY (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Company_ID) - COMPANY (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Currency_Code_ID) - CURRENCY (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Customer_ID) - CUSTOMER (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Cut_Off_Date_ID) - CUT OFF DATE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Proj_End_Date_ID) - PROJ END DATE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Proj_Forecast_Id) - PROJ FORECAST (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Proj_Forecast_Type_Id) - PROJ FORECAST TYPE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Account_Id) - ACCOUNT (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Accounting_Period_Id) - ACCOUNTING PERIOD (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Activity_ID) - ACTIVITY (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_D_Id) - CODE D (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_E_Id) - CODE E (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_G_Id) - CODE G (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_H_Id) - CODE H (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Actual_Finish_Date_ID) - ACTUAL FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Baseline_Finish_Date_ID) - BASELINE FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Baseline_Start_Date_ID) - BASELINE START DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_B_Id) - CODE B (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_C_Id) - CODE C (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_F_Id) - CODE F (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_I_Id) - CODE I (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Company_ID) - COMPANY (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Cost_Rev_Element_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Currency_Code_ID) - CURRENCY (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Customer_ID) - CUSTOMER (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Early_Start_Date_ID) - EARLY START DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Late_Finish_Date_ID) - LATE FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Late_Start_Date_ID) - LATE START DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Project_ID) - PROJECT (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Account_Id) - ACCOUNT (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Accounting_Period_Id) - ACCOUNTING PERIOD (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Activity_ID) - ACTIVITY (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Actual_Finish_Date_ID) - ACTUAL FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Actual_Start_Date_ID) - ACTUAL START DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Baseline_Finish_Date_ID) - BASELINE FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_B_Id) - CODE B (ID) |
PROJECT HISTORY DETAILS PHD (DIM_BASELINE_FINISH_DATE_ID) - BASELINE FINISH DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_BASELINE_START_DATE_ID) - BASELINE START DATE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Cost_Rev_Element_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Proj_Start_Date_ID) - PROJ START DATE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Project_ID) - PROJECT (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Actual_Start_Date_ID) - ACTUAL START DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Code_J_Id) - CODE J (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Early_Finish_Date_ID) - EARLY FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Baseline_Start_Date_ID) - BASELINE START DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_C_Id) - CODE C (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_D_Id) - CODE D (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_E_Id) - CODE E (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_F_Id) - CODE F (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_G_Id) - CODE G (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_H_Id) - CODE H (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_I_Id) - CODE I (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Code_J_Id) - CODE J (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Company_ID) - COMPANY (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Cost_Rev_Element_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Currency_Code_ID) - CURRENCY (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Customer_ID) - CUSTOMER (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Early_Finish_Date_ID) - EARLY FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Early_Start_Date_ID) - EARLY START DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Late_Finish_Date_ID) - LATE FINISH DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Late_Start_Date_ID) - LATE START DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Project_ID) - PROJECT (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
PROJECT TRANSACTIONS (Dim_Account_Date_ID) - FORECAST EARLY FINISH DATE (ID) |
PROJECT TRANSACTIONS (Dim_Activity_ID) - ACTIVITY (ID) |
PROJECT TRANSACTIONS (Dim_Company_ID) - COMPANY (ID) |
PROJECT TRANSACTIONS (Dim_Currency_Code_ID) - CURRENCY (ID) |
PROJECT TRANSACTIONS (Dim_Customer_ID) - CUSTOMER (ID) |
PROJECT TRANSACTIONS (Dim_Employee_Category_ID) - EMPLOYEE CATEGORY (ID) |
PROJECT TRANSACTIONS (Dim_Employee_ID) - EMPLOYEE (ID) |
PROJECT TRANSACTIONS (Dim_Organization_Code_ID) - ORGANIZATION CODE (ID) |
PROJECT TRANSACTIONS (Dim_Position_ID) - POSITION (ID) |
PROJECT TRANSACTIONS (Dim_Price_Adjustment_ID) - PRICE ADJUSTMENT (ID) |
PROJECT TRANSACTIONS (Dim_Proj_Billing_Category_ID) - PROJ BILLING CATEGORY (ID) |
PROJECT TRANSACTIONS (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
PROJECT TRANSACTIONS (Dim_Project_ID) - PROJECT (ID) |
PROJECT TRANSACTIONS (Dim_Report_Code_Id) - REPORT CODE (ID) |
PROJECT TRANSACTIONS (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
PROJECT TRANSACTIONS (Dim_Work_Location_ID) - WORK LOCATION (ID) |
INVOICING PLANS (Dim_Activity_ID) - ACTIVITY (ID) |
INVOICING PLANS (Dim_Company_ID) - COMPANY (ID) |
INVOICING PLANS (Dim_Currency_Code_ID) - CURRENCY (ID) |
INVOICING PLANS (Dim_Customer_ID) - CUSTOMER (ID) |
INVOICING PLANS (Dim_Prjrep_Start_Date_ID) - PRJREP START DATE (ID) |
INVOICING PLANS (Dim_Proj_Program_ID) - PROJECT PROGRAM (ID) |
INVOICING PLANS (Dim_Project_ID) - PROJECT (ID) |
INVOICING PLANS (Dim_Report_Code_Id) - REPORT CODE (ID) |
INVOICING PLANS (Dim_Sub_Project_ID) - SUB PROJECT (ID) |
INVOICING PLANS (Dim_Reporting_Period_ID) - REPORTING PERIOD (Company-Date) |
PROJECT TRANSACTIONS (Dim_Reporting_Period_ID) - REPORTING PERIOD (Company-Date) |
INVOICING PLANS (Dim_Planned_Inv_Date_ID) - PLANNED INV DATE (ID) |
INVOICING PLANS (Dim_Planned_Inv_Date_ID) - REPORTING DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_EARLY_FINISH_DATE_ID) - EARLY FINISH DATE (ID) |
PROJECT ACTIVITY PERFORMANCE ANALYSIS (DIM_REPORTING_DATE_ID) - REPORTING DATE (ID) |
PROJECT FORECAST ITEM PERIOD PFP (Dim_Reporting_Date_ID) - REPORTING DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_HISTORY_DATE_ID) - HISTORY DATE (ID) |
PROJECT HISTORY DETAILS PHD (DIM_REPORTING_DATE_ID) - REPORTING DATE (ID) |
PROJECT FORECAST SNAPSHOT PFS (Dim_Cut_Off_Date_ID) - REPORTING DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Cut_Off_Date_ID) - CUT OFF DATE (ID) |
PROJECT FORECAST SNAPSHOT WITH DETAILS PSD (Dim_Reporting_Date_ID) - REPORTING DATE (ID) |
PROJECT TRANSACTIONS (Dim_Reporting_Date_ID) - REPORTING DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_COST_REV_ELEMENT_ID) - PROJECT COST REVENUE ELEMENT (ID) |
PROJECT ACTIVITY INFORMATION (DIM_PROJ_PROGRAM_ID) - PROJECT PROGRAM (ID) |
PROJECT ACTIVITY INFORMATION (DIM_COMPANY_ID) - COMPANY (ID) |
PROJECT ACTIVITY INFORMATION (DIM_ACTIVITY_ID) - ACTIVITY (ID) |
PROJECT ACTIVITY INFORMATION (DIM_SUB_PROJECT_ID) - SUB PROJECT (ID) |
PROJECT ACTIVITY INFORMATION (DIM_PROJECT_ID) - PROJECT (ID) |
PROJECT ACTIVITY INFORMATION (DIM_CUSTOMER_ID) - CUSTOMER (ID) |
PROJECT ACTIVITY INFORMATION (DIM_EARLY_FINISH_DATE_ID) - REPORTING DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_ACTUAL_START_DATE_ID) - ACTUAL START DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_EARLY_START_DATE_ID) - EARLY START DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_LATE_FINISH_DATE_ID) - LATE FINISH DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_ACTUAL_FINISH_DATE_ID) - ACTUAL FINISH DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_LATE_START_DATE_ID) - LATE START DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_BASELINE_START_DATE_ID) - BASELINE START DATE (ID) |
PROJECT ACTIVITY INFORMATION (DIM_BASELINE_FINISH_DATE_ID) - BASELINE FINISH DATE (ID) |
REPORTING CURRENCY RATE (Dim_Reporting_Currency_ID) - REPORTING CURRENCY (ID) |
REPORTING CURRENCY RATE (Dim_Time_ID) - REPORTING DATE (ID) |