Perform this activity to connect and/or disconnect a resource from a resource structure. Adding a new resource can also be done through the assistant, where relevant information can be defined in the steps.
The resource structure can be changed by connecting and disconnecting existing resources and resource groups. The following relations are allowed:
Resource Type | Can contain |
Machine Group | Machines and other machine groups |
Person Group | Persons and other person groups |
Tool/Equipment Group | Tools/equipment and other tool/equipment groups |
Crew Group | Crews and crew group. |
A resource structure with resources must exist.
Resources are disconnected and connected to new parents in a resource structure.