This activity is used to manually change the status of a material requisition from Released to Planned. This is done if the material requisition is not considered to be a demand yet. When the requisition is in Planned status, reservation of materials is not allowed.
A material requisition header must have been entered and saved.
The status of the material requisition will be changed to Planned.