Enable/Disable Revision Control on PM Program

Explanation

Use this activity to enable/ disable revision control on an existing PM program, however, it is normally done before a PM program is started.

When Revision Control is ON;

When Revision Control is OFF;

Prerequisites

A PM program revision in Active or Preliminary status should exist in the system.

System Effects

As a result of this activity a journal entry is created in the PM Program that the revision control has been enabled/ disabled.