This activity is used to study the workload of a certain resource, work center, production line, department or labor class during a specified time range. Depending on which page you use, the workload is grouped in different ways like per workday, order, operation, labor class or work center.
To view load, a load should exist either from scheduled shop orders or from CRP calculations within the specified time range.
To view the load via anticipated orders like shop order requisitions and unreleased DOP, the capacity requirements planning calculation must have been performed.
N/A