Use this activity to analyze the material availability for a set of shop orders. Planning part is only available for Company owned Stock and Supplier Consignment Stock. The availability information represents all open demand and supply orders for every shop order component. A shortage occurs when the projected quantity on hand is less than zero
Select the shop order to analyze the availability for in the upper list, the material lines are shown in the below Material Availability list. Use the options in the lower list to control how the material lines are displayed:
Enter a date in the Pick Plan Date field if you want to use a different date instead of the Required Date when calculating the Projected On Hand Qty, Total Demand and Total Supply.
N/A