Load Saved Simulation File

Explanation

This activity is used to load a previously saved simulation session into the Advanced Planning Board (simulation mode), Simulation Client, or Maintenance Planning Board Client (simulation mode)

Prerequisites

This activity requires that the previous simulation has been saved to a file.

Clients should be running on simulation mode.

 

System Effects

As a result of this activity, a previously saved simulation session is loaded into he Advanced Planning Board (simulation mode), Simulation Client, or Maintenance Planning Board Client (simulation mode).