This activity is used to load a previously saved simulation session into the Advanced Planning Board (simulation mode), Simulation Client, or Maintenance Planning Board Client (simulation mode)
This activity requires that the previous simulation has been saved to a file.
Clients should be running on simulation mode.
As a result of this activity, a previously saved simulation session is loaded into he Advanced Planning Board (simulation mode), Simulation Client, or Maintenance Planning Board Client (simulation mode).