Change Production

Explanation

This activity is used to register changes for an ongoing production (runtime) on an operation, or sequence of operations.

To perform this activity from Shop Floor Workbench, select operation(s) with ongoing production and click Change Production. It is also possible to perform this activity in Operation Guide. Then you select an operation in Shop Floor Workbench with ongoing production, open Operation Guide and click Change Production.

In the dialog you can register below changes:

You can also change the clocking note if required.

Prerequisites

System Effects