Issue Handling Unit to Shop Order Material Line
Explanation
Use this activity to issue complete handling unit(s) to a shop order material
line.
To issue complete handling unit(s) from:
- Manual Issue Shop Order Material Line page. Open the
Handling Units tab, select the relevant handling units and
click Issue Handling Unit.
- Warehouse Data Collection page. Click Manual Issue Shop Order Handling Unit
and perform the steps required based on the configuration of the data
capture process and the setup of the data.
Prerequisites
- The shop order is in at least Released, or Reserved status.
- A handling unit with a quantity of the part to issue attached exists
in inventory.
- The handling unit does not have any reserved quantity to another order.
- The handling unit does not contain mixed part numbers.
- The quantity available on the handling unit is higher than zero, but
not higher than the quantity remaining to issue.
- If the shop order material line supply code is Inventory Order,
only the standard inventory is available to issue.
- If the shop order material line supply code is Project Inventory,
only the project inventory of the project, connected to the shop order is
available to issue.
- The ownership and owner must be the same on the material line as on
the handling unit to issue.
- The condition code must be the same on the material line as the handling
unit to issue.
- All MRO disassembly and repair orders connected to the MRO assembly shop order
must have been completely received.
- Likewise, all disposition orders connected to the MRO disassembly order
in a shop visit must have been completely received
(If an order on the
level below is not finished, some serials may not be reserved. This may
cause the expected on-log to be updated with incomplete information.)
- To perform this activity
using the Warehouse Data Collection page, the
user must be given access to the MANUAL_ISSUE_HU_SHOP_ORDER configuration
and the configuration must be in status Released.
System Effects
- All stock records attached to the selected handling unit, or any of
its sub-level handling units will be issued from inventory.
- The shop order material line status will be set to Issued.
- The status of the shop order will be set to Started.
- Inventory transaction history records (SOISS) will be created for
the issued components.
- If the shop order was created from project delivery, the project delivery
structure will be updated with the quantity issued.
- When issuing a pegged line manually, the pegged quantity is reduced
by the same quantity that was issued. Note: If more than one supply
is pegged to the same demand, you will be prompted to manually adjust peggings
prior to performing the issue of material.
- The expected on-log is created (or updated) with the structure for the
level below.
- Log entries are generated each time the Perform Preliminary Conformance
Check function is run (i.e., either manually or automatically). These entries
can be viewed in the Shop Order/Prelim. Conformance
Log tab or MRO Interim Order Structure/Preliminary
Conformance Log tab.
- For a serial tracked part, the current position is set to
Issued on Part Serial page.