Report Production Schedule Progress Point
Explanation
This activity is used to report production that was performed at a defined
progress point.
You cannot report more production than was reported at a previous progress point, i.e., quantities must be reported through each
progress point defined.
To perform this activity from Production Schedule by Line
or Production Schedule by Part pages, select the relevant
production schedule line and click Report.
To perform this activity from Production Schedule Progress Point
Reporting
page, select the relevant report point and click
Report Quantity.
In the Report Production Schedule assistant:
- Select Progress Point
as the Report Type.
- Enter the quantity of parts to report in
the Qty to Report field. The scheduled quantity is the
default value.
- Enter the date and time when the quantity was produced in the
Time of Production field.
- Select the Progress Point.
- In the Schedule Option drop-down, select Scheduled to
consume from the quantity scheduled, or Unscheduled to not
consume from the scheduled quantity.
- If you want the report to be executed as a background job, enable
the Background Job option.
- In the Structure / Routing sections, specify the
structure/routing revision and alternate used to produce the parts.
- If you want to manually edit the components used rather than
backflush the components according to the selected structure
revision/alternate, or manually select the location, lot/batch no,
handling unit etc. to backflush. Enable the Edit
Components option and specify the components consumed in the Components step of the assistant.
- If the part is serialized with serial
tracked components, these must be manually assigned in the Components
step.
If the parent part comprises of one or more catch unit
(CU) enabled component parts, you must first reserve the catch unit enabled
components.
Note: Labor and operation setup time for each receipt is calculated as;
[(setup time/standard lot size)*receipt quantity]
If standard lot size is not defined, then the total setup time will be reported for every receipt.
Prerequisites
This activity requires that the production schedule exists. A part must be associated
with a production line. Production schedule progress points must be defined for the production line.
System Effects
- The system backflushes the components and operations used
up to a defined progress point.
- The progress point balance is updated for the specific
progress
point.
- If a routing is defined, all operation steps falling between this report point and
the previous one are backflushed at standard cost.
- Operation-linked components used by the
reported operations are backflushed. Material not linked to operations is assumed to be
required at the start of the production. Thus, it is backflushed at the first
progress
point. If inbound locations are defined, they are used by backflush in its search
hierarchy. If an alternate component substitution sequence is defined, it is used by
backflush when issuing material. Inventory transactions are created
for all issued components.
- Operations history transactions are written for any backflushed
machine or labor operations.