Use this activity to view progress point balances by line part, i.e., progress point balances for each unique part produced in the line. As production is reported past a progress point, the balance for that progress point is increased, reducing the balance at the previous progress point.
This activity requires that production be reported at a prpgress point for the specific production schedule.
As a result of this activity, the system displays the progress point balance for a unique part produced in the line.