Evaluate MS Result using Cumulative Graph

Explanation

Use this page to generate a graph displaying the following types of cumulative Master Scheduling (MS) data for a selected Level 0 or Level 1 part: projected balance, cumulative forecast, cumulative planned receipts and projected time phased safety stock.

The selections that you make in this page determine which data will be shown on the graph.

The time span of the data shown on the graph is based on the Begin Period number and the End Period number of the period template.In the Select Period Range dialog, which appears from the command Calculate Graph, the default period begin date is the last run date of the Level 0 or Level 1 part selected in the Part No list. The default period end date is the planning time fence date of the Level 0 or Level 1 part selected in the Part No list. The period numbers associated with these dates are also displayed. You can change these period numbers, if desired. In order to plot the graph, however, the begin date of the period template must be equal to the last run date of the Level 0 or Level 1 part selected in the Part No list. If this is not the case before you plot the graph, you can correct the template's begin and end dates from the command Recalculate Period Template.

Note: Periods on the period template depends on the work time calendar based on which the period template was generated. Therefore, to view all data, a period template based on a calendar which has seven days for its schedule has to be used. This approach can be specifically used to view forecasts on non-working days.

Prerequisites

This activity requires that a Level 0 or Level 1 part exists. A period template also must exist. 

System Effects

As a result of this activity, the system generates a graph of cumulative Master Scheduling data for a user-specified Level 0 or Level 1 part. It shows in the Cumulative Graph section at the bottom of the page.